Hamzadere Dam Pump Stations DCS System
In 2011, Prizma Group Automation installed Hamzadere Dam Pumping Station in DCS System in Edirne, Turkey. The DCS System consists of the following components:
• DCS System Control Center,
• Pump Stations DCS Units,
• DCS Remote I / O Units.
Server / Client architecture was installed by utilizing ABB Electric Control Builder Freelance software was in the Control Centers and the following systems were used as hardware:
• ABB Electric AC800FR Freelance DCS Units,
• ABB Electric AC800FR Freelance Remote I / O Units.