Hamzadere Dam

Hamzadere Dam Pump Stations DCS System

In 2011, Prizma Group Automation installed Hamzadere Dam Pumping Station in DCS System in Edirne, Turkey. The DCS System consists of the following components:

• DCS System Control Center,
• Pump Stations DCS Units,
• DCS Remote I / O Units.

Server / Client architecture was installed by utilizing ABB Electric Control Builder Freelance software was in the Control Centers and the following systems were used as hardware:

• ABB Electric AC800FR Freelance DCS Units,
• ABB Electric AC800FR Freelance Remote I / O Units.