Dukan Filters

Dukan Drinking Water Treatment Plant Filter Buildings Electrification Works

In 2012, Prizma Group Automation successfully completed the electrification works of the additional Filter Buildings of Dukan Drinking Water Treatment Plant in Sulaymaniyah, Iraq. Contracting works consist of the following parts:

• 0.4kV Low Voltage Distribution Panels,
• Filter Control Panels and PLC Units,
• Instrumentation Systems,
• SCADA System,
• Cable trays, conduits and cable works.

Low voltage switchgear materials used in contracting works were obtained from ABB Electric, instruments from Hach-Lange and Krohne and automation systems from Siemens.