Dukan Phase-2

Dukan Drinking Water Treatment Plant Phase-2 Electrification Works

In 2012, Prizma Group Automation successfully completed the electrification works of the pumping stations project established in the 2nd Phase of Dukan Drinking Water Treatment Plant in Sulaimaniyah, Iraq. Contracting works consist of the following parts:

• 6kV and 33kV Medium Voltage Distribution Facilities,
• 33 / 6kV Transformers,
• 33 / 6kV Medium Voltage Switchgear Groups,
• 6kV Medium Voltage Softstarter Units,
• 0.4kV Low Voltage Distribution Panels,
• Instrumentation Systems,
• SCADA System,
• MV / LV Cabling.

Transformers and medium voltage switchgears used in the scope of contracting works were obtained from ABB Electric and medium voltage softstarters were obtained from IGEL Electronics