Aydın 150-bed hospital energy SCADA automation, Aydın, Türkiye

Prizma Group Automation has successfully completed the Factory Acceptance Tests -FAT  of an Energy Automation / SCADA System for the TOKI 400 Bed Government Hospital in Aydın, Turkey, 2010. Site installation and commissioning activities are scheduled in early 2011.

The Automation / SCADA System consist of the following major components:

  • SCADA Control Center,
  • PLC Units,

The SCADA Control Center was equipped with a SCADA Server and Operator Workstation for remote monitoring and control of the Medium Voltage and Low Voltage Switchgear systems.

The SCADA System was equipped with top-quality industrial automation products from the leading manufacturers in order to comply with strict tender specifications and to meet customer satisfaction.

The SCADA system was equipped with ABB AC500 PLC and I/O Units at control system level while the SCADA Server and the Operator Workstation is equipped with Rockwell Software's FactoryTalk SCADA HMI Software. The ABB AC500 PLC was programmed and configured with ABB's Codesys V2.3 PLC programming and configuration software.

 

 

LOW VOLTAGE

 

MEDIUM VOLTAGE

 

PROTECTION RELAY

 

TOPOLOGY

Prizma Grup Otomasyon Elektrik İnşaat Taahüt Sanayi ve Tic. Ltd.Şti.
Ağaç İşleri Sanayi Sitesi 1354. Cadde 1358. Sokak No: 43 İvedik, Yenimahalle / ANKARA - Phone: +90 (312) 395 09 22 (Pbx) - Fax: +90 (312) 395 09 66 - E-mail: info@prizmaotomasyon.com.tr