Prizma Group Automation has successfully completed engineering, installation and commissioning activities of an Energy Automation / SCADA System for the TOKI 200 Bed Government Hospital in Trabzon, Turkey, 2010.
The Automation / SCADA System consist of the following major components:
The SCADA Control Center was equipped with a SCADA Server and Operator Workstation for remote monitoring and control of the Medium Voltage and Low Voltage Switchgear systems.
The SCADA System was equipped with top-quality industrial automation products from the leading manufacturers in order to comply with strict tender specifications and to meet customer satisfaction.
Rockwell Automation's Allen Bradley brand PLC and I/O Units were utilized in order to provide a reliable automation system. Allen Bradley's 1769-L32E CompactLogix5332E PLC and I/O System was utilized as the core of the system.
The SCADA Server and the Operator Workstation were installed with Rockwell Software's FactoryTalk SCADA HMI Software and the PLCs were programmed with Rockwell Software's RSLogix 5000 programming and configuration software.
LOW VOLTAGE
MEDIUM VOLTAGE
PROTECTION RELAY
TOPOLOGY